- Next Day Propping*
The Actech Early Propping Supports Provide a safe and cost effective way to prop panels in low strength concrete floors.
Simply locate the correct propping position and secure the base to the formwork soffit.
Cut M12 allthread to suit the finished height of the support.
Code | Name | Pack |
---|---|---|
50962012.DEF.ZR | M20-M12 x 96 DEF Round Ferrule - Zinc | 50 |
50962012.DEF.GR | M20-M12 x 96 DEF Round Ferrule - Gal | 50 |
50962012.BASE.G | M20-M12 x 96 DEF Base - Gal | 50 |
Load Rating of EPS
Concrete Strength | 8 MPA | 10 MPA | 15 MPA | 20 MPA | 25 MPA | 30 MPA | 40 MPA |
---|---|---|---|---|---|---|---|
Tension | 34.38 kN | 38.44 kN | 47.08 kN | 48.00 kN** | 48.00 kN** | 48.00 kN** | 48.00 kN** |
Max Prop Load | 39.70 kN | 44.44 kN | 54.63 kN | 55.40 kN** | 55.40 kN** | 55.40 kN** | 55.40 kN** |
Max Prop Shear | 19.85 kN | 22.20 kN | 27.18 kN | 27.70 kN** | 27.70 kN** | 27.70 kN** | 27.70 kN** |
*‘Next Day Propping’ is subject to concrete achieving minimum strength
**The pull out capacity is limited by the capacity of ferrule.
WLL calculations based on FOS = 2.5